Townhouse Project, Burleigh Heads

Construction is progressing quickly at Burleigh Heads.

 

The wall frame, floor and roof frames are now 100% complete.  The electrical, plumbing and air conditioning services are roughed in and the roofing is nearly finished. The coloured block work is in position and ready for core fill.  These walls really make a statement when viewing the project from the driveway and add a chunky feel to contrast the main lightweight cladding.

 

The lower windows and doors are also installed.  The 2400mm high by 1200mm wide solid entrance doors look amazing and the internal corner sliding stacker door to unit 3 is really going to open up the lower living areas.